From the shop floor
New machines, audits, apprentices and the occasional note on designing parts that are cheaper to make.
Posts
6
Updated
Sep 2026

·
Shop news
Two new 5-axis machines are on the floor
We added two 5-axis machining centers this summer. Here is what they change for lead times.

·
Engineering
How we quote in 48 hours
What happens between the moment your drawing lands and the moment a quote comes back.

·
Quality
We passed our AS9100D surveillance audit
Zero major findings and one minor on calibration records, closed the same week.

·
Careers
Our apprenticeship class of 2026
Four new apprentices started this June. Two of them had never stood in front of a machine.

·
Engineering
Designing parts that are cheaper to machine
Six small drawing changes that cut cost without touching how the part works.

·
Shop news
Why we still run a second shift
Lights-out machining gets the headlines. People on second shift still ship our hardest parts.
Send a drawing. Get a quote in 48 hours.
STEP, IGES, PDF or DXF. We sign your NDA before you send anything.