All capabilities
Welding and fabrication
TIG, MIG and robotic welding to AWS D1.1 and D17.1, with post-weld machining in the same building.
Tolerance
±0.010 in (0.25 mm) after machining
Quantities
1 to 500 pcs
Lead time
2 to 5 weeks

Four certified welders and one robotic cell build frames, bases and weldments. When a weldment needs machined faces, it goes straight from the weld bay to a horizontal mill, so the datums are cut after the heat is in.
Our welders are certified to AWS D1.1 for structural steel and D17.1 for aerospace work.
What we build
Machine bases and frames
Stainless skids and carts
Aluminum weldments for equipment
Fixtures and lifting frames
Spec sheet
Tolerance
±0.010 in (0.25 mm) after machining
Materials
Carbon steel, stainless, aluminum
Envelope
Frames up to 8 × 4 × 4 ft (2.4 × 1.2 × 1.2 m)
Quantities
1 to 500 pcs
Lead time
2 to 5 weeks


The machines that do this work
Units
1
Projects that used this capability
No case study for this one yet.
Ask us for references, we have plenty of parts to show.
Send a drawing. Get a quote in 48 hours.
STEP, IGES, PDF or DXF. We sign your NDA before you send anything.